At the beginning of the design and construction of the STAR Detector, thecollaboration assigned a team of physicists and engineers the responsibility ofcoordinating the construction of the detector. This group managed the generalspace assignments for each sub-system and coordinated the assembly and planningfor the detector. Furthermore, as this group was the only STAR group with theresponsibility of looking at the system as a whole, the collaboration assignedit several tasks that spanned the different sub-detectors. These items includedgrounding, rack layout, cable distribution, electrical, power and water, andsafety systems. This paper describes these systems and their performance.