Publish
Home
Live
new
RH Journal
ResearchCoin
Grants
Funding
Browse
Journals
Hubs
Tools
Lab Notebook
Beta
Reference Manager
Resources
Verify Identity
Community
Support
About
Terms
Privacy
Issues
Docs
Author
Log in
Sign up
BZ
Biao Zhang
Author with expertise in Scheduling Problems in Manufacturing Systems
Achievements
Cited Author
Key Stats
Upvotes received:
0
Publications:
4
(0% Open Access)
Cited by:
204
h-index:
30
/
i10-index:
52
Reputation
Biology
< 1%
Chemistry
< 1%
Economics
< 1%
Show more
How is this calculated?
Overview
Publications
4
Peer Reviews
Comments
Grants
Publications
0
Mixed-integer linear programming and constraint programming formulations for solving distributed flexible job shop scheduling problem
Leilei Meng
et al.
Feb 11, 2020
Industrial And Manufacturing Engineering
Computer Science
0
Paper
Industrial And Manufacturing Engineering
204
0
Save
0
Comparative investigation of axial monotonic performance of grouted helical steel pipe piles (GHSPP): Experiments, simulations and calculation method
Biao Zhang
et al.
Nov 9, 2024
Civil And Structural Engineering
Mathematics
0
Paper
Civil And Structural Engineering
Mathematics
0
Save
0
Dual-Stage Jaya algorithm for optimizing valve openings in heating system networks
Chao Xu
et al.
Jan 1, 2025
Geology
Paleontology
0
Paper
Geology
Paleontology
0
Save
0
MILP modeling and optimization of flexible job shop scheduling problem with preventive maintenance
Lixin Zhao
et al.
Jan 1, 2025
Industrial And Manufacturing Engineering
Computer Science
0
Paper
Industrial And Manufacturing Engineering
Computer Science
0
Save